Transmission Line Works (Malvar Batangas)
Erection and stringing of 73 Poles for 69kV OHTL
ClientAboitiz Construction Inc.
LocationMalvar, Batangas
CompletionNovember 06, 2022
The project covered pole installation, structural assembly, and conductor stringing, executed with strict adherence to safety standards and engineering specifications. Through efficient coordination, skilled manpower, and proper equipment deployment, JFA ensured timely and quality delivery of the transmission infrastructure.